unified benefit
Location: Home > > Case Two

Ltd., Suzhou, planning 55 injection moulding machines, water, electricity, gas, centralised material supply system in one of the whole plant system. Water supply system, taking into account the number of machines, water supply distance and water pressure and flow and temperature and health control have high requirements for the system configured with high-power explosion rod machine, water storage tanks, square water towers and other equipment to ensure that meet the requirements. The use of 4 with 2 standby high head and high flow loading station to ensure uninterrupted operation of the system.

Central feeding system planning programme in order to achieve a great use of the workshop area, the corner of the workshop to build a steel platform. Stainless steel storage barrels and central console are placed under the platform, and central vacuum generator and energy-saving dry manipulator are placed on the platform to provide conveying power and drying treatment for raw materials. Because the drying equipments are many and centralised, the upper floor of the platform is closed with fireproof cotton rock boards, and there are 12 exhaust fans installed on the upper floor of the platform for discharging the centralised heat out of the workshop, which greatly reduces the temperature of the workshop. The noise of the vacuum generator is also reduced through the barrier, which greatly improves the working environment.

未标题-5.jpg

CopyRight © 2024Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd Sitemap
WeChat

【WeChat】

Link: