unified benefit
Location: Home > > Case Three

Zhejiang a cleaning equipment limited company is a manufacturer of car hoover manufacturers, planning 76 sets of injection moulding machine material centralised conveying system. The case of the number of machines, large amount of material, material types, conveying distance, product diversity and other issues is the focus of the programme discussion, after many discussions with the customer finalised. Workshop 76 sets of injection moulding machine wind 8 groups at the same time to achieve the centralised material supply and centralised air supply functional requirements. The material supply part adopts 8 sets of Roots vacuum generator to guarantee the uninterrupted supply of materials. In one corner of the workshop, a steel platform is built to centralise the raw material handling area so as to facilitate operation and management.

The customer's entire workshop where three kinds of materials are used in great quantities, the program planning in the workshop on the outside wall side of the installation of a positive pressure conveying system, configured with three 10T raw material storage silo used for tuning raw materials, positive pressure conveying system 1 hour conveying capacity of up to 8T delivery can be ensured for the entire workshop 1 shift of the supply of materials to save a large number of labour costs, but also reduces the intensity of labour. The system is equipped with 6 groups of raw material selection stations to achieve the switching of raw materials, as the working conditions of the machine materials are complicated. The air supply system is connected to the dryer on the platform above the moulding machine, and the switching between air supply and material supply is easily achieved through the quick connector and system parameter setting, which meets the customer's needs.


1.jpg

CopyRight © 2024Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd Sitemap
WeChat

【WeChat】

Link: